Nelson Associates' President, Peter
N. Nelson, PE*, provided engineering and project management for
the approximately 35,000 square foot remediation research facility.
The facility consists of a 150 - foot clear span pre-engineered
metal building.
The purpose of the facility is to research various methods of
remediating contaminated soils. The facility was designed as
a containment structure with double containment walls and slabs
with monitoring ports. |
Project Size:
35,000 SF
Construction Costs: $1.2 Million
|